Vibe Coder · Unit 6: Thinking in Products · Lesson 3 of 9

Scope it small

The first version should do one job well. How to cut a feature list down to the smallest thing worth using.

Read the short notes and pictures.Do everything inside a blue frame.

The smallest thing worth using

A first version exists to learn whether the problem and the answer are right. The smaller it is, the sooner you learn. Small does not mean poor: it means one job done properly.

A 3D scene of coloured blocks and cards. : Must have, Later.
Must-haves are what the one job cannot work without.

Cutting the list

  1. Write the one job

    "A designer sends a correct invoice in one minute."

  2. List every feature

    Let Claude help you brainstorm, without judging yet.

  3. Mark the must-haves

    Only what the one job cannot work without.

  4. Park the rest

    In a list called "Later", with a line on why.

A 3D scene of coloured blocks and cards. Then sort: list everything, sort it, cut it.
List everything, sort it, cut it.

Good reasons to cut

It serves a second kind of user

Later.

It needs something else first

Later.

You are not sure anyone wants it

Ask first, then decide.

ActivityBuild stepYour product spec

Scope your first version

Write the one job in a sentence. Brainstorm features with Claude, then sort them into "Must have" and "Later". Aim for five must-haves or fewer and add both lists to the spec.

Done when

The must-have list is exactly what you will prototype.

Keep these

  • A first version does one job well.
  • Sort features into must have and later.
  • Smaller ships sooner and teaches more.